1990.

The company NDC L.L.C. BEOGRAD has been registered in September 20th 1990 as private company for manufacturing and trading NDC Inc.

2000.

The Company was awarded the Certificate of compliance (issued by the Ministry of Construction under no. 351-00134/2000-04) – Corporate Licence for design and preparation of documents such us:

  • Design documents of electrical installations for substations 110kV and more under the construction authorisation of the relevant State Ministry

Released by the Ministry of Infrastructure.

2005.

The company registration at the Trade Registry was officially amended with the following name: Design, engineering and consulting company NDC LLC, Belgrade. The company was registered with a short name NDC LLC, Belgrade.

By its Resolution 351-00134/2000-04 issued on 20.04.2000, the Ministry of Infrastructure gave the license P062E1 to NDC LLC for design of electrical installations of high and medium voltage substations 110kV and higher, for projects to be built under the construction authorisation issued by relevant state or provincial authorities.

2007.

The company acquired the ISO 9001: 2000 certificate, proving the compliance with the quality management standards.

The Corporate Licence was extended in 2009, 2011, 2013 and 2015

2017.

The company continues to expand the list of licenses further, to the following final resolution (351-02-02515/2017-07 of 27.02.2018):

  • P050E1 - design of electrical high and medium voltage installations for impoundment hydropower plants10MW and more;
  • P051E1 – design of electrical high and medium voltage installations for hydropower plants 10MW and more;
  • P0521E1 – design of electrical high and medium voltage installations for thermal power plants 10MW and more;
  • P062E1 – design of electrical high and medium voltage installations for substations 110kV and higher;
  • P90E1 – design of electrical high and medium voltage for renewable power stations 10MW and more;
  • I050E1 - execution of works for high and medium voltage installations for impoundment hydropower plants 10MW and more
  • I051E1 – execution of works for high and medium voltage installations of hydropower plants 10MW and more;
  • I052E1 - execution of works for high and medium voltage installations of thermal power plants 10MW and more;
  • I053E1 - execution of works for high and medium voltage installations of combined heat and power plants 10MW and more;
  • I062E1 – execution of works for high and medium voltage installations of substations 110kV and higher;
  • P90E1 – execution of works for high and medium voltage for renewable power plants 10MW and more;

The transition to ISO 9001: 2015 has been completed and it has been confirmed that the quality management system is being successfully applied in conformity with the standard for quality management systems for the following scope of certification:

Design, engineering and consulting in electrical installations of all voltage levels, particularly the installation of medium and high voltage hydropower plants of 10 MW and more, thermal power plant of 10 MW and more, transformer substations of 110 kV and higher, as well as for facilities for the production energy from renewable resources power of 10 MW and more and thermal power plants-electric power of 10 MW and more.

The company received certificate about the credit rating and is rated with AA + rating from Companywall Business who provides the best Serbian companies with a certificate of prudential excellence.

sertifikati ndc

Copyright © 2019 NDC - Projektovanje, inženjering, konsalting. Sva prava zadržana.